The grounding should be done with two ground rods driven into the ground outside the building. 1. They can be seen by an inspector. 2. The connections can be checked and tightened if needed.
The grounding should be done with two ground rods driven into the ground outside the building. 1. They can be seen by an inspector. 2. The connections can be checked and tightened if needed.Before pouring the footer for the garage, I asked the electrician if I should be running anything for grounding
The panel will have a bar where the ground from each run of wire is attached. At the end of the bar will be a lug to attach a ground wire, that is run to your ground rods outside.I see nothing on the cabin subpanel in terms of a grounding electrode.