    I'm in kentucky.

    I've got 530 feet I need to run a water line from the meter to my almost livable homestead (I'm moving there in a couple weeks, water or not).

    The water line needs to be 30inches deep here by code. The plumbing inspector needs to inspect the entire thing before it's covered up.

    Has anyone hand dug a trench like this before? Is it crazy to even think I could do it myself?

    The quotes I've gotten just for the excavation work are

    $1 per foot ($530) local guy

    $2 per foot ($1060) local guy

    and to rent a backhoe nearby

    $480
    - $190 per day (2 days) plus $50 delivery each way

    Free - using my already paid for shovels and my back :)

    I've got the cash but I really, really don't want it to give it to someone to dig a long hole for me.

    Is it crazy to think I could dig a trench that deep and that long myself? How long would it take you? Thanks.
     
  2. RJMAcres

    RJMAcres Well-Known Member

    Messages:
    259
    Joined:
    Sep 9, 2009
    I think it's crazy to do it but hey, I like my back intact.
     

  3. switchman62

    switchman62 Well-Known Member

    Messages:
    437
    Joined:
    Oct 18, 2007
    Location:
    Illinois (West Central)
    I dug one about 120ft long/ 3ft deep last spring. The first 2 ft down is not bad. The final foot down is a pain. You cant get down in the trench to work the shovel. It took me a full weekend to do it.

    I'd vote for the $1 per foot guy.

    Dave
     
  4. sammyd

    sammyd Well-Known Member

    Messages:
    5,780
    Joined:
    Mar 10, 2007
    Location:
    Central WI
    hire the dollar a foot guy and start yourself at the other end.....
     
  5. rzrubek

    rzrubek Flying Z

    Messages:
    636
    Joined:
    May 12, 2004
    Location:
    Chapel Hill, NC
    I'm with the "Hire the dollar a foot guy" crowd. Save your back and do something else around the place to get it ready.
     
  6. mainegirl

    mainegirl Well-Known Member

    Messages:
    103
    Joined:
    Feb 20, 2011
    Location:
    northern maine..
    we thought we could do a trench half that long and we were wrong....i agree with dave...the first two feet aren't bad and you're thinking...i can do this....but the last foot and little bit are something else...we also found that as we worked around the edges it would fill in a little and we had to redig some sections and the occasional unforseen obstacle would present itself...rocks, roots, impossibly hard dirt..... we eventually hired a guy at about a dollar foot and it was by far the best money we spent.....
     
  7. Cheribelle

    Cheribelle Well-Known Member Supporter

    Messages:
    2,541
    Joined:
    Jul 23, 2007
    Location:
    S.E. Iowa
    Aren't there a lot of rocks in Kentucky?
     
  8. myheaven

    myheaven Well-Known Member Supporter

    Messages:
    4,293
    Joined:
    Apr 13, 2006
    Location:
    wisconsin
    higher it out. We often Barter things like this.
     
  9. Ky-Jeeper

    Ky-Jeeper Well-Known Member

    Messages:
    431
    Joined:
    Sep 5, 2010
    Location:
    Ky
    When I was 21 and out of work I dug 100' or so of water line north of Bowling Green Ky. I was acustomed to hard work, but it was one of hardest jobs I've done. Rent a Ditch Witch. If you have large limestone let someone with a backhoe dig it.
     
  10. motdaugrnds

    motdaugrnds II Corinthians 5:7

    Messages:
    9,291
    Joined:
    Jul 2, 2002
    Location:
    Virginia
    I am 69 yrs old. David is 48 yrs old. We dug a trench that is slightly over 100 ft long for our freeze-proof water hydrant. It had to be 4 ft at one end and it sloped down hill; so it got more and more shallow. The majority of it was 3 ft deep.

    The ground we had to dig in was sandstone,sand rocks & hard clay with a few granite stones in it. It was a terrible thing to dig; yet we got it done!

    My suggestion to you would be dependant on the type of soil you are digging in. A trench that shallow would be difficult; but much depends on how hard your ground is. However, a trench that "long" would keep me depressed! If you have the money, I would definately hire it done!
     
  11. Yvonne's hubby

    Yvonne's hubby Murphy was an optimist ;) Staff Member

    Messages:
    26,677
    Joined:
    Oct 3, 2005
    Location:
    Kentucky
    Crazy? naw, just masochistic. It will take weeks to dig a trench that long, that deep, and it will be brutal on your body. I had to run 800 feet of water line for my place and rented a small backhoe. It took me about 5 hours and cost around 150 bucks. But then I am lazy and generally try to find the easy way out of most things. :)
     
  12. meanwhile

    meanwhile Well-Known Member Supporter

    Messages:
    3,117
    Joined:
    Dec 13, 2007
    Location:
    Western North Carolina
    I dug such a trench when I was pregnant! Yes, indeed! This is one of those "I walked barefoot to school in the snow, uphill both ways" types of stories:

    The Power company told me they would dig the trench with a "ditch witch" but charge me $380.00 to dig it. This was in 1997. At the time I thought $380.00 was robbing me and I told them I would dig the trench my own self. I did not realize I was pregnant yet or I would not have done it........

    The Contractor who was renovating the house said he would not help and he said he did not think I would dig the trench. He left for the weekend. The Inspector said he did not think I could dig it and the Electric Company said they did not think I could dig it by hand either. I told them to "hide and watch".

    I had the help of my 2 young boys, then ages 5 and 8. I also had the help of 2 young men, ages 20 and 24. It took us all day long both Saturday and Sunday. We had to chip through an old gravel driveway bed and then dig into the dirt. We just chipped and shoveled and we took turns and we got it finished late Sunday.

    Monday morning when the Electric Company was supposed to arrive at 8 AM, they did not show up. When I called them, they said there was "no way" I had dug that trench in only 2 days. They made me put the Contractor on the phone to confirm the ditch was dug. Later that day, two Supervisors from the Electric Company showed up to see my ditch and they told me that never had any "woman" dug such a ditch. I was pretty proud but still mad that they would charge such a high fee when they had the ditch-witch to begin with.

    I am still glad we dug the ditch ourselves. It was a "moral" issue for me since I did not think the power company should be charging that much money. My older boys still remember digging the ditch and the "morality tale" behind it and they are still proud. The 2 men who helped still laugh about the time they helped me dig the ditch and keep the $380. from the power company.

    I would say if you have someone to help you and you can just make a weekend out of it, then do it. If your time, however, can be better spent doing some other task that would be more valuable to you, then pay the money and get help.

    Did you try to rent a ditch witch? Would that be cheaper than the backhoe? We rented a ditch-witch another time but it clogged up with roots and we had to get a backhoe to finish.

    Good luck!
     
  13. Native87

    Native87 Dad,Proud Veteran,Farmer

    Messages:
    194
    Joined:
    Jan 21, 2010
    Location:
    Virginia
    I will never forget my water line. It is about 325 ft long and we used an old 5hp tiller that was narrower in the back than the tines were on the front. It was used to loosen the dirt and then we shoveled it out. When we came to a rock we just had to hand dig it. It was a crazy job mostly straight uphill but we did get it. I wouldnt want to do it again. That old tiller by the way still gets used in the garden at times. Its got to be 30 years old.
     
  14. geo in mi

    geo in mi Well-Known Member Supporter

    Messages:
    5,949
    Joined:
    Nov 14, 2008
    Find two macho football players who want to stay in shape for the winter season. Put them on each end and start them to a flag at the middle. First one to get to the flag wins........and gets a cash bonus. Instead of tug of war, it's "dug" of war. Invite the cheerleaders, take pledges for a local charity--make a high school contest out of it.

    :)

    geo
     
  15. kirkmcquest

    kirkmcquest Well-Known Member

    Messages:
    2,054
    Joined:
    Oct 21, 2010
    Location:
    Adirondack mountains
    Sounds like a nightmare. I don't know what your kentucky ground is like, but I'd be hitting rocks every few of feet here.

    I suppose you CAN do it...the more hands you can get to help you the better.
     
  16. snoozy

    snoozy Well-Known Member Supporter

    Messages:
    3,025
    Joined:
    May 10, 2002
    Location:
    Kitsap Co, WA
    Use your brains not your brawn. Save your brawn for stuff there is no other way to get done. If you don't like the $1 a foot deal, get some other bids. On the other hand, $1/ft is very easy to figure...
     
  17. SparkyMaine

    SparkyMaine Well-Known Member

    Messages:
    58
    Joined:
    Jan 10, 2011
    Location:
    Maine
    Find out how much it would cost to rent a mini-excavator in your area. I've never rented one, but I've heard of prices around a couple hundred dollars per day. Maybe you could rent one for a day for half the cost of the $/foot guy and get it done in a day? Maybe that's too much to get done in a single day? Certainly worth looking into as an option...
     
  18. SparkyMaine

    SparkyMaine Well-Known Member

    Messages:
    58
    Joined:
    Jan 10, 2011
    Location:
    Maine
    And actually, you might also look into a heavy duty trencher. Maybe it would be wide enough / deep enough for what you need, at a little less $$ than an excavator?
     
  19. Two Cents Worth

    Two Cents Worth Well-Known Member

    Messages:
    104
    Joined:
    Dec 8, 2002
    Why use a more expensive back hoe when a trencher will do? Rocks?

    Assemble the water line beside the trench and move it into the trench and test before backfilling.
     
  20. GREENCOUNTYPETE

    GREENCOUNTYPETE Moderator Staff Member

    Messages:
    7,865
    Joined:
    Jul 25, 2006
    Location:
    WISCONSIN
    yes it can be done , sounds like some thing i might have tried but having dug 50 foot 3 foot deep trenches and had it take all day i would think yours will take a solid week or two , if your unemployed and have nothing but time on you hands go for it but if you have anything better to do a dollar a foot seems very reasonable

    in my town at the end of the civil war there was a lot of returning men from the war so they had a great idea to put them to work and they dug a 2 mile long race to divert the river to a hydro plant in the middle of town they did it and it ran the mill , dairy and we had electric before milwakee or chicago and we were a tiny little town more people live on one block in chicago than all of our town combined , that amount of digging would now be done by 4-5 earth movers in a week or 2 weeks time but if you have the labor use it.


    go did all day tomorrow , then decide if 1 dollar a foot is worth it.