Quote:
|
Originally Posted by crobar
The contractor must be conservative he is responsible for the results, however if you intend to fill the steps with concrete and it's on the edge of the slab, I think it will crack.
|
i agree. if it was not over anything critical, i would say just do it and deal with any cracks if they come. you don't want cracks to break the pipes.
i agree on the use of pre-cast steps.